Eurofighter Typhoon ' Germany' Wood Model Airplane

    Eurofighter Typhoon ' Germany' Wood Model Airplane

    Code: NC10258

    Regular Price: $189.95

    Our Price: $119.95

    Quantity in Basket: None

    Quantity:

    Scale: 1/52
    Length: 12"
    Wingspan: 8.2"

    The series production of the Eurofighter Typhoon is underway, and the aircraft is being procured under three separate contracts (named "tranches"), each for aircraft with generally improved capabilities. The aircraft has entered service with the Royal Air Force, the German Luftwaffe, the Italian Air Force, the Spanish Air Force, the Austrian Air Force and the Royal Saudi Air Force.

    The UK had identified a requirement for a new fighter as early as 1971. A specification, AST 403, issued by the Air Staff in 1972, resulted in a conventional "tailed" design known as P.96, which was presented in the late 1970s. While the design would have met the Air Staff's requirements, the UK air industry had reservations as it appeared to be very similar to the McDonnell Douglas F/A-18 Hornet, which was then well advanced in its development. The design had little potential for future growth, and when it entered production it would secure few exports in a market in which the Hornet would be well established.Simultaneously, by 1979 the West German requirement for a new fighter had led to the development of the TKF-90 concept. This was a cranked delta wing design with forward canard controls and artificial stability. Although the British Aerospace designers rejected some of its advanced features such as vectoring engine nozzles and vented trailing-edge controls, they agreed with the overall configuration.

    The maiden flight of the Eurofighter prototype took place on 27 March 1994.[1] DASA Chief Test Pilot Peter Weger took the prototype on a test flight around Bavaria. The 1990s saw significant arguments over work share, the specification of the aircraft and even participation in the project.

    On 9 December 2004, Eurofighter Typhoon IPA4 began three months of Cold Environmental Trials (CET) at the Vidsel Air Base in Sweden, the purpose of which was to verify the operational behaviour of the aircraft and its systems in temperatures between -25 and -31 °C.

    In May 2007, Eurofighter Development Aircraft 5 made the first flight with the CAESAR demonstrator system, a development of the Euroradar CAPTOR incorporating Active Electronically Scanned Array (AESA) technology.

    The first production contract was signed on 30 January 1998 between Eurofighter GmbH, Eurojet and NETMA. The procurement totals were as follows: UK 232, Germany 180, Italy 121, and Spain 87. Production was again allotted according to procurement: British Aerospace (37.42%), DASA (29.03%), Aeritalia (19.52%), and CASA (14.03%).